EI received eight weeks of training scheme through my university.
There were many rooms:, including pioneers technical systems, print electronic boards, industrialization electronic services, design, and industrial the board electronic boards.
Service measurements for the water, energy, oil, and industrial controls were taken.
I saw the installation of machinery and the connecting of control cables during the undefactory construction factory.
The text above was approved for publishing by the original author.
Previous
     
Next
פשוט גש לתיבת האימייל שלך, ולחץ על הלינק לאימות, ומייד נתקן עבורך את האיימייל. אם אתה רוצה לתקן עוד אימיילים אז:
או