• Collins is going to proceed with the outline drawing (HS773289A), thatwhich includes all of the parts except the -19, which remains on the current outline drawing (HS773289).
• Collins• Collins's team is working on creating a new drawing. The new drawing will undergo their normal process of engineering for the change request.
• Collins said it will take at least 2two weeks to get it done on their side - ECD 07/01.
• ACTION: Boeing will quantify the effects of the new drawing number. Boeing will have an internal discussion to understand the impact of this change on the PSD release.
• This is an existing drawing that effectaffects multiple airplane models in service. Boeing needs to understand if the process will be different, and how it will affect the schedule for the AP neededthat needs to be delivered with the -21.
• • The Boeing SCO added a new part to the contract last week. This week the part has been transitioned to a purchase order. Today it was confirmed with Collins that they have received all the POPOs.
• The first shipment will be arriving on Aug 9.
• The drawing needs to be in place prior theto the first shipment.
• Need• We need to make sure the drawing is in place prior theto the first shipping.
• Question from Boeing: Does Collins needs Boeingneed Boeing's approval offor the existing HS773289 drawing that has the removals?
•
The text above was approved for publishing by the original author.
Previous
     
Next
פשוט גש לתיבת האימייל שלך, ולחץ על הלינק לאימות, ומייד נתקן עבורך את האיימייל. אם אתה רוצה לתקן עוד אימיילים אז:
או